The project on behalf of Bulgari Gioielli S.p.A. involves the expansion of the existing production site based in the municipality of Valenza, in an area called Cascina dell’Orefice, on the border with the municipality of Pecetto di Valenza with the construction of a new manufactory intended for offices and production (building NM) a new connecting body with an overhead bridge between the new and existing manufactory (building CB) and buildings intended for technoclogical impinati (buildings EH and NMT).
Client:
Bulgari Jewelry S.p.a
General Contractor:
Carron S.p.A.
Designer
Polytechnic
B.Cube role:
Architectural design and coordination of disciplines + BIM modeling
Bulgari Jewelry S.p.a
General Contractor:
Carron S.p.A.
Designer
Polytechnic
B.Cube role:
Architectural design and coordination of disciplines + BIM modeling