The intervention is framed within the larger area already implemented (Zone R 1.8 – CEc1) on which the recreational-sports field is located. The area of intervention is reduced by about sq. m. 340 to ensure the widening of the road section consistent with the first section of Fatebenesorelle Street and the directions of the R1.8 Recovery Area Guide Project. The building has a longitudinal lay that forms the final scenic backdrop to the perspective visible from Moscova Street and given the orientation, the need for energy efficiency and the opportunity to protect the front facing Fatebenesorelle Street. The building is designed on an orthogonal mesh of cm.150×150 that ends on the diagonal of the pedestrian path and is divided into two contiguous one-story constructions with flat roof and perceptible height.
Invesco Real Estate
Designer
Alpina Spa
Role B.Cube:
RUP.