This work fits in as a complement to the construction of the nearby new S.Anna Hospital in Como. The distinguishing element is darkly the roofing with a roof garden strongly desired by the architect and the client to allow a more harmonious inclusion in the “green” context of the Como Pre-Alps. Structural calculation and graphical drawings, of two buildings intended for a helicopter rescue operation base and operations center with 118 emergency management service characterized by a slab foundation and a prefabricated structure consisting of hollow core slabs and prestressed beams with an inverted T section.
Client:
Lombardy Infrastructure
Designer
Bortolazzi – Pooleng
Role B.Cube:
Identification of a system that would allow a reduction in construction time and improvement of the structural system starting with the foundations for which deep foundations were planned. The economic improvement was made by treating and reclaiming the soil on which a slab foundation was then made. Above-ground structures were replaced with a prefabrication system.
Lombardy Infrastructure
Designer
Bortolazzi – Pooleng
Role B.Cube:
Identification of a system that would allow a reduction in construction time and improvement of the structural system starting with the foundations for which deep foundations were planned. The economic improvement was made by treating and reclaiming the soil on which a slab foundation was then made. Above-ground structures were replaced with a prefabrication system.