The project involves the construction of a multi-story building (one basement and six above ground), to be used for hotels, offices and hospitality service spaces related to the activities carried out by “the Caravaggio” airport.
The related services and common areas of the accommodation facility are developed on the first two floors above ground: on the ground floor Reception, Bar Cafeteria, Play Area, Restaurant, with the preparation and cooking areas, on the first floor the large Breakfast Room/Banquet with the related service area of food preparation and washing, the Meeting Area, consisting of modular rooms up to 90/100 seats, a terrace of 80 square meters, and a small Fitness area.
On the ground floor, a large unified space is envisaged that will house the reception and lobby, bar, and restaurant room. The areas dedicated to customers will be separated from the service rooms (back of house) reducing the interference of their relative flows and paths. The room floors, from the second to the sixth, feature 36 rooms per floor for a total of 180 double rooms, including 2 per floor that are compliant for people with reduced mobility.
The related services and common areas of the accommodation facility are developed on the first two floors above ground: on the ground floor Reception, Bar Cafeteria, Play Area, Restaurant, with the preparation and cooking areas, on the first floor the large Breakfast Room/Banquet with the related service area of food preparation and washing, the Meeting Area, consisting of modular rooms up to 90/100 seats, a terrace of 80 square meters, and a small Fitness area.
On the ground floor, a large unified space is envisaged that will house the reception and lobby, bar, and restaurant room. The areas dedicated to customers will be separated from the service rooms (back of house) reducing the interference of their relative flows and paths. The room floors, from the second to the sixth, feature 36 rooms per floor for a total of 180 double rooms, including 2 per floor that are compliant for people with reduced mobility.
Client:
S.A.C.B.O. S.p.A.
General Contractor:
Gencantieri S.p.a.
Designer:
PR5/BURO MILAN/TEKSER
B.Cube Role:
Technical and economic study and critical analysis of the project at the bidding stage; Construction and detailed civil works design and coordination of facilities and facades.